INSTALLATION TIMELINE

Z

1. SITE ASSESSMENT (2-5 BUSINESS DAYS)

Site assessor measures and takes readings of the roof. Access to electrical panel and interior is needed.

2. ENGINEERING AND DESIGN (3-5 WEEKS)

Our engineering team designs and plans your solar project to ensure the best system possible.

3. PERMITS (NYC: 8-10 WEEKS | UPSTATE/LONG ISLAND: 3-5 WEEKS)

We apply for permits and communicate with your utility company.

4. INSTALL (2-3 BUSINESS DAYS)

Our installation team installs and hard-wires your solar system.

U

5. INSPECTION (3-8 WEEKS)

Your city’s building department conducts inspections to ensure the quality and safety of the installation.

6. ACTIVACIÓN DEL SISTEMA (2-4 SEMANAS) 

Una vez que recibamos la aprobación de su empresa de servicios públicos, será seguro activar su sistema. ¡Todos los sistemas están listos! Disfrute de la energía solar.

Roofing & Solar Integration Experts

  • Roof Types: Specialists in flat, slate, metal, asphalt tile, clay, and Spanish tile surfaces.

  • Turnkey Service: Full management from initial consultation and engineering to your solar panel installation.

  • Quality Assurance: A professional, streamlined, and completely hassle-free experience.

Roof Integrity Guarantee: We preserve your roof’s structural integrity and warranty throughout the entire solar installation process.

Pre-Design Inspection: We conduct a preliminary roof inspection prior to final solar design approval («Schedule Your Free Roof & Solar Inspection»).

Take control of your energy use