INSTALLATION TIMELINE
1. SITE ASSESSMENT (2-5 BUSINESS DAYS)
Site assessor measures and takes readings of the roof. Access to electrical panel and interior is needed.
2. ENGINEERING AND DESIGN (3-5 WEEKS)
Our engineering team designs and plans your solar project to ensure the best system possible.
3. PERMITS (NYC: 8-10 WEEKS | UPSTATE/LONG ISLAND: 3-5 WEEKS)
We apply for permits and communicate with your utility company.
4. INSTALL (2-3 BUSINESS DAYS)
Our installation team installs and hard-wires your solar system.
5. INSPECTION (3-8 WEEKS)
Your city’s building department conducts inspections to ensure the quality and safety of the installation.
6. ACTIVACIÓN DEL SISTEMA (2-4 SEMANAS)
Una vez que recibamos la aprobación de su empresa de servicios públicos, será seguro activar su sistema. ¡Todos los sistemas están listos! Disfrute de la energía solar.
Roofing & Solar Integration Experts
-
Roof Types: Specialists in flat, slate, metal, asphalt tile, clay, and Spanish tile surfaces.
-
Turnkey Service: Full management from initial consultation and engineering to your solar panel installation.
-
Quality Assurance: A professional, streamlined, and completely hassle-free experience.
Roof Integrity Guarantee: We preserve your roof’s structural integrity and warranty throughout the entire solar installation process.
Pre-Design Inspection: We conduct a preliminary roof inspection prior to final solar design approval («Schedule Your Free Roof & Solar Inspection»).