INSTALLATION TIMELINE
1. SITE ASSESSMENT (2-5 BUSINESS DAYS)
Site assessor measures and takes readings of the roof. Access to electrical panel and interior is needed.
2. ENGINEERING AND DESIGN (3-5 WEEKS)
Our engineering team designs and plans your solar project to ensure the best system possible.
3. PERMITS (NYC: 8-10 WEEKS | UPSTATE/LONG ISLAND: 3-5 WEEKS)
We apply for permits and communicate with your utility company.
4. INSTALL (2-3 BUSINESS DAYS)
Our installation team installs and hard-wires your solar system.
5. INSPECTION (3-8 WEEKS)
Your city’s building department conducts inspections to ensure the quality and safety of the installation.
6. SYSTEM ACTIVATION (2-4 WEEKS)
Once we receive approval from your utility, it is safe to activate your system. All systems are GO! Enjoy solar with SunPower® by Kamtech Solar.